Projects

Flood Defence,Roads,Soft Ground

Baled Tyres Access Road Design for Clare CoCo in Dooras

Project: Baled Tyres Access Road Design, Co. Clare Location: Dooras, O’Callaghan’s Mills, Co. Clare Client: C...

view project

Dewatering,Temporary Works

Dewatering System Design for Cork City Court Buildings, Co. Cork

Project: Dewatering System Design for Cork City Court Buildings, Co. Cork Location: Anglesea Street, Co. Cork Cli...

view project

Karst,MIcropile Design,Soft Ground

Element Six, Shannon Airport – Micropiles for refurbishment of Press Hall

Location: Co. Clare Client: Walls Construction / TJ O’Connor & Associates Project Value: Completed: 2015...

view project

Foundations,Pile Design

The Curragh Racecourse Redevelopment

Project: The Curragh Racecourse Redevelopement Location: The Curragh, Co. Kildare Client: Brazil Piling & Fou...

view project

Earthworks,Roads,Site Investigation,Slope Stability

N52 Cloghan to Billistown Phase 1 Road Project

Project: N52 Cloghan to Billistown Phase 1 Road Project Location: Co. Westmeath Client: Westmeath County Council ...

view project

Foundations,Pile Design,Retaining Walls

Brewery Quarter Student Accommodation, Cork

Project: Brewery Quarter Student Accommodation, Cork Location: Main Street, Cork city Client: McDonnell Piling &a...

view project

Commercial,Foundations,Pile Design,Temporary Works

The Capitol Cinema Redevelopment, Cork

Project: The Capitol Cinema Revelopment Location: Grande Parade, Cork city Client: McDonnell Piling & Foundat...

view project

Bridges,Dewatering,Earthworks,Finite Element Analysis,Flood Defence,Foundations,Pile Design,Pile Drivability,Risk Assessment,Slope Stability,Temporary Works

N25 New Ross Bypass River Barrow Bridge Temporary Falsework Foundations and Pier Platforms

Location: New Ross, Co. Kilkenny/Co. Wexford Client: New Ross Joint Venture (NRJV) Estimated completion date: Aut...

view project

Category III Checkers,Earthworks,Roads,Slope Stability

M17/M18 Gort to Tuam PPP Scheme

Location: Co. Galway Client: Halcrow Barry Project Value: €550 million Completed: Construction In Progress -...

view project

Roads,Site Investigation

N4 Collooney to Castlebaldwin Road Scheme

Location: Co. Sligo Client: Sligo County Council Project Value: €100 million Country: Ireland The Proposed Road...

view project

Peat Stability,Risk Assessment,Windfarms

Derrybrien Windfarm, Co. Galway

The project involved the construction of 70 turbines with over 20 km of site access tracks,...

view project

Bridges,Foundations,Pile Design

New Europe Bridge

Location: Vidin, Bulgaria Client: FCC Construction Project Value: €282 million Country: Bulgaria/Romania ...

view project

Earthworks,Flood Defence,Ground Anchors,Retaining Walls

River Dargle Flood Defence Scheme – La Vallee

Location: Bray Co. Wicklow Client: Jons Civil Engineering Co. Ltd. Project Value: €3.5 million Country: Irel...

view project

Earthworks,Foundations,Pile Design,Windfarms

Richfields Windfarm

Location: "Sloblands", Co. Wexford Client: Mercury International Project Value: €6 million Categories: Windfarm, R...

view project

Bridges,Rail,Roads,Site Investigation

New Europe Bridge – Road and Rail Western Approach Corridor

Location: Vidin, Bulgaria Client: FCC Construction Categories: Road, Motorway, Rail, High Speed Rail, Site Investigat...

view project

Coastal Erosion,Slope Stability,Soil Nailing

Coastal Erosion Protection and Slope Stabilisation at Tara Glen Golf & Country Club

Location: Ballymoney, Co. Wexford Client: Tara Glen Golf and Country Club Project Value: €250,000 AGL Consulting...

view project

Bridges,Category III Checkers,Earthworks,Foundations,Pile Design,Roads

A31 Magherafelt Bypass

Location: Magherafelt, Co. Derry, Northern Ireland Client: Transport Northern Ireland (TNI) Contactor: BAM McCann Joi...

view project

Finite Element Analysis,Ground Anchors,Quay Walls,Retaining Walls,Sheet Piles,Temporary Works

Dublin Waste to Energy Facility, Covanta

AGL Consulting designed the temporary cofferdam that facilitated construction of the pump station for the cooling...

view project

Commercial,Earthworks,Foundations,Industrial,Pyrite

SYSCO/Pallas Foods Distribution Centre

Location: Kilnamonagh, North Co. Dublin. Client: John Paul Construction/Balfour Beatty JV Project Value: €43 mi...

view project

Earthworks,Reservoirs,Water Treatment

Srowland Raw Water Storage Reservoirs

Location: Athy, Co. Kildare Client: BAM Civil/Veolia Project Value: €25 million Completed: 2013 Country: Ireland ...

view project

Cofferdams,Finite Element Analysis,Pile Drivability,Retaining Walls,Temporary Works

New Wear Crossing Bridge, Central Pier Temporary Works Cofferdam

AGL were the designers of a temporary cofferdam structure at Sunderland, UK which facilitated the construction...

view project

Earthworks,Finite Element Analysis,Roads,Slope Stability

N2 Carrickmacross Bypass

Location: Carrickmacross, Co. Monaghan Client: Jons Moneley JV Project Value: €25 million Completed: 2005 Country...

view project

Peat Stability,Risk Assessment,Windfarms

Garvagh Glebe Windfarm

AGL Consulting were geotechnical consultants to ESB International for the construction of 13 No. Vestas V80/2MW turbin...

view project

Dewatering,Finite Element Analysis,Temporary Works,Tunnels

Limerick Tunnel PPP

AGL were geotechnical designers for the temporary works for the tunnel casting basin which was 550 m...

view project

Finite Element Analysis,Quay Walls,Retaining Walls

Alexandra Quay Re-Development, Dublin Port

AGL are geotechnical designers for a new quay wall at Alexandra Quay East in Dublin Port...

view project

Cofferdams,Dewatering,Finite Element Analysis,Retaining Walls,Sheet Piles,Temporary Works

Aghada CCGT Power Plant

AGL were geotechnical designers for the temporary cofferdam used for the construction of the cooling water intake...

view project

Cofferdams,Finite Element Analysis,Ground Anchors,Retaining Walls,Sheet Piles,Temporary Works,Tunnels

Corrib Gas Pipeline Project, Tunnel Start and Receptions Shafts

AGL were the temporary works designer to the BAM Civil and Wayss & Freytag Joint Venture...

view project